FIREPLACE BUILDER / HULL

 4FT OAK BEAM BRACED AND PLASTRED IN
 SLATE LOOK TILES &ANTHRITE GROUT
 AWAITING GAS LOG BURNER LOOK GAS STOVE TO BE FITTED BY MR RICHARD STARLING


 BUILDING THE BASE WITH BRICK TO TILE TO

 OLD LOOK CASANDRA BRICKS / FANTASTIC COLOURING IN THEM
 BREAKING OUT


THE START

Thursday, 10 May 2012

hullfireplacebuilder.com /york / hull







 BUILDING THE FRAME
 CONCRETING IN THE POSTS




 Gaps stated on decking websites say 6mm -10mm and fall from back to front or away from a building.10mm per meter so ie.3.6mtrs would be 36 mm of fall for rain (stated.)
 finished

 finished

 finished

Friday, 4 May 2012

hullfireplacebuilder.com /york / hull

 START   / PATIO LAYED / FENCE POST CONCRETED IN


 FINISHED TO CUSTOMERS EASY MAINTAINENCE SPEC

 TURFED UP / FENCED UP
 GRAVELLED UP

FIREPLACE BUILDER / hull

 SOLID MARBLE TILES / CASSANDRA OLD LOOK BRICKS
 STOVE FITTER MR RICHARD STARLING,HETAS,GAS SAFE,LPG FITTER
 STOVE FITTED WITH DOWNLIGHTERS
 AWAITING SURROUND ADDEASIVE TO DRY. BUILDING THE HEARTH
START OPENED UP AND RELINTLED.BRICKWORK INNER STARTED