Wednesday, 12 September 2012

HULLFIREPLACEBUILDER.COM (PRESTON)

 THE START / FALSE BREAST OPENED UP SO EXSISTING BREAST COULD BE RESIZED
 GAS FLUE Z1M BLOCKS REMOVED WITH BLOCKWORK,READY TO BE RELINTLED AND OPENING IN OUTER WALL FOR TWIN WILL FLUE TO GO THROUGH
 OAK BEAM SEATED IN AND RELINED SIDES AND BACK WITH PAINTABLE FIREBOARD.WIRING LEFT FOR CUSTOMERS DOWNLIGHTERS
 HARTH DONE IN 600MM X 300MM SATIN BLK SLATE RIPPLE TILES AND ANTHRITE BLACK GROUT
 OAK BEAM 4FT X 5.5" X 5.5" .PLASTRED IN READY FOR CUSTOMER TO OIL UP
ESSE 100 MULIFUEL STOVE 5 KW FITTED BY RICHARD STARLING (HETAS ,LPG ,GAS SAFR FITTER )

Sunday, 9 September 2012

HULLFIREPLACEBUILDER.COM (ANLABY)

 THE START
 THE REAL BOSS
 LINING THE SIDES WITH CASSANDRA BRICKS

 RIGHT HAND SIDE FULL BRICKS
 LEFT SIDE WITH FULL BRICKS AND CUT BRICK SLIPS ON THE BACK
 4FT  X7X7" SOLID OAK BEAM


 INDIAN SLATE TILED HEARTH

 ESSE 100DD STOVE
 FITTED BY RICH STARLING


Monday, 3 September 2012

FIREPLACE BUILDER (FERRIBY)

 START./OLD EXSISTING FIRE OPENING
 CASSANDRA BRICK SLIPS

 LAID LIKE TILES

 POINTED UP AND BRUSH FINISH TO LOOK OLD
FINSHED

HULLSFIREPLACEBUILDER.COM (PICKERING RD)

 TILING OVER EXSISTING LIMESTONE HEARTH WITH CREAM STONE LOOK TILES
 PAINTABLE FIREBOARD INNER LINING

 LINER PUT DOWN READY FOR STOVE CONNECTION
 HEARTH TILED ,SQUARED OFF AND FRONT SLIPS ON.GROUTED IN BLK