Wednesday, 29 August 2012

HULLSFIREPLACEBUILDER.COM (EAST HULL)

 THE SOOTY START
 RE LINING WITH NEW BUT OLD LOOK YELLOW YORK HANDMADE BRICKS
 QUIRKY MAD OAK BEAM
 OAK READY TO BE STAINED

 BLK GLOSS BLACK TILED HEARTH

Friday, 10 August 2012

HULLFIREPLACEBUILDER.COM (WILLERBY)

 START (OLD COAL FIRE)
 BROKEN OUT AFTER 5 HOURS ON THE BREAKER





 10MM PAINTABLE FIREBOARD.SCREWED TO THE BRICKWORK / COUNTER SUNK SCREWS AND FILLED READY FOR PAINTING
 EDGES PLASTRED INTO 10MM FIREBOARD SIDES



 STONE LOOK STAGGERED TILES WITH BLACK GROUT

 5 X 5" KNOTTED OAK BEAM
FURTHER PICTURES TO FOLLOW AFTER PAINTING AND FITTING BY RICHARD STARLING

Wednesday, 8 August 2012

HULLFIREPLACEBUILDER.COM (BRICKNALL AVE)

 THE START /OLD BACK BOILER
 THE BOSS.LOL
 LINTLED WITH SOLID OAK MANTLE INTO EXISTING BRICKWORK READY FOR PILLARS

 BRICKWORK LAYED FOR HEARTH / BACK LINED IN PAINTABLE 12MM CEMPANEL FIREBOARD
 STARTING OF PILLARS IN OLD YORK HANDMADE BRICKS

 FANTASTIC QUIRKY OAK MANTLE





 PILLAR BUILT READY FOR POINTING UP


 NATURAL SLATE TILES
 PLASTERED UP AND STOVE IN





 FITTED AND TESTED BY HETAS /LPG/GAS SAFE FITTER MR RICHARD STARLING (07916126115)